We finally got a bit of rain, the rebar got inspected and Tomorrow Morning will be the first concrete to the site. I did a quick walk around to look at the site while Chase and Nathan prepped the concrete pump. They opted to have the concrete for the footings be the same mix as what will be sprayed in the dome so they can check how the mix pumps ahead of time before they are actually shooting.
The Blue pipes in the pictures are the sleeves for the plumbing to go through the foundation. The North end (in the pic above) is the water into the house and the North HVAC and on the other end is the South HVAC and the Drain plumbing.
Facebook Update