Oh Boy is it different to be in the Domes with the Fans OFF.
They Finished the Shotcrete Friday Morning and this is video in the Domes Saturday. John just picked up a couple LED High Bay Work Lights so we have something once South Industries packs up all their equipment. Next steps will be locating plumbing and electrical in the floor and doing the internal tie beams and footers for under the inset walls and then perhaps pouring the floor (not sure yet if they are going to do the floor and the tie beams/wall footers at the same time as the floor slab or not.)
Also still waiting on details of who we will be using to do the inset and augment walls. Probably going to be using scip (Structural Concrete Insulated Panels) for those.
Anyway, here are some more pictures from the inside.