{"id":643,"date":"2025-02-12T22:11:28","date_gmt":"2025-02-13T03:11:28","guid":{"rendered":"https:\/\/tclynx.com\/construction\/?p=643"},"modified":"2025-02-12T22:11:30","modified_gmt":"2025-02-13T03:11:30","slug":"so-much-going-on-feb-12-2025","status":"publish","type":"post","link":"https:\/\/tclynx.com\/construction\/2025\/02\/12\/so-much-going-on-feb-12-2025\/","title":{"rendered":"So Much going on. Feb 12, 2025"},"content":{"rendered":"\n<p>Well I&#8217;ve not kept up with my posting about the progress here.<br>I have lots of report.<br>Emil and his crew Did a wonderful job finishing out the SCIP walls and soffits<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1000\" data-id=\"644\" src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/Jan-24-2025-finishing-scips-1024x1000.jpg\" alt=\"Finishing coating the SCIPs\" class=\"wp-image-644\" srcset=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/Jan-24-2025-finishing-scips-1024x1000.jpg 1024w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/Jan-24-2025-finishing-scips-300x293.jpg 300w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/Jan-24-2025-finishing-scips-768x750.jpg 768w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/Jan-24-2025-finishing-scips-1536x1500.jpg 1536w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/Jan-24-2025-finishing-scips-2048x2000.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">SCIP coating nearly complete<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<p>Then before starting framing on the inside, it made sense to have the crew go ahead and smooth coat the inside of the domes since they did such beautiful work on the scip walls.<br>As they were starting on the smooth coat for the inside of the Domes, the windows were installed.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1805-1024x768.jpg\" alt=\"Windows getting installed\" class=\"wp-image-647\" srcset=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1805-1024x768.jpg 1024w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1805-300x225.jpg 300w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1805-768x576.jpg 768w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1805-1536x1152.jpg 1536w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1805-2048x1536.jpg 2048w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1805-800x600.jpg 800w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Windows<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1800-1024x768.jpg\" alt=\"Starting smooth coat\" class=\"wp-image-646\" srcset=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1800-1024x768.jpg 1024w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1800-300x225.jpg 300w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1800-768x576.jpg 768w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1800-1536x1152.jpg 1536w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1800-2048x1536.jpg 2048w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1800-800x600.jpg 800w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Crew starting the Smooth coat<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1843-1024x768.jpg\" alt=\"More smooth coat\" class=\"wp-image-645\" srcset=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1843-1024x768.jpg 1024w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1843-300x225.jpg 300w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1843-768x576.jpg 768w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1843-1536x1152.jpg 1536w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1843-2048x1536.jpg 2048w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1843-800x600.jpg 800w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Emil Working on smooth Coat<\/figcaption><\/figure>\n\n\n\n<p>As the guys were finishing up the smooth coat, the framers got started.<br><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1865-1024x768.jpg\" alt=\"Smooth coat done and framing begins\" class=\"wp-image-648\" srcset=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1865-1024x768.jpg 1024w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1865-300x225.jpg 300w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1865-768x576.jpg 768w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1865-1536x1152.jpg 1536w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1865-2048x1536.jpg 2048w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1865-800x600.jpg 800w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Smooth coat finished and Framing begins<\/figcaption><\/figure>\n\n\n\n<p>Which brings us to Today. Most of the walls interior Framed walls are in place.<br><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1885-1024x768.jpg\" alt=\"South Walls framed\" class=\"wp-image-649\" srcset=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1885-1024x768.jpg 1024w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1885-300x225.jpg 300w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1885-768x576.jpg 768w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1885-1536x1152.jpg 1536w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1885-2048x1536.jpg 2048w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1885-800x600.jpg 800w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">South Framing<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1886-1024x768.jpg\" alt=\"North Walls framed\" class=\"wp-image-650\" srcset=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1886-1024x768.jpg 1024w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1886-300x225.jpg 300w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1886-768x576.jpg 768w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1886-1536x1152.jpg 1536w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1886-2048x1536.jpg 2048w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2025\/02\/GOPR1886-800x600.jpg 800w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">North Framing<\/figcaption><\/figure>\n\n\n\n<p>Framing left to do; Kitchen\/Pantry wall.  And then the Loft Joists on each end.<br><br>Electrical and Mechanical (Plumbing\/HVAC) Rough in scheduled for next week.<br><br>Hopefully we can get doors in before drywall the following week.  Also, as soon as doors are in, we will be ready to have the exterior trim done and then the exterior walls will get a coat of synthetic stucco with integral color.  Following that at some point Trim work, Paint, floors, Cabinets, Finishing fittings, plumbing, lighting, appliances.<br>somewhere in all that we need Railings up top.<br><br>Here is really hoping that we are less than 12 weeks from CO and moving in.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Well I&#8217;ve not kept up with my posting about the progress here.I have lots of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":649,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,4,55],"tags":[59,50,58],"class_list":["post-643","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-progress","category-scips","tag-framing","tag-scip","tag-stucco"],"_links":{"self":[{"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/posts\/643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/comments?post=643"}],"version-history":[{"count":1,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/posts\/643\/revisions"}],"predecessor-version":[{"id":651,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/posts\/643\/revisions\/651"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/media\/649"}],"wp:attachment":[{"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/media?parent=643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/categories?post=643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/tags?post=643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}