{"id":567,"date":"2024-09-13T12:32:38","date_gmt":"2024-09-13T16:32:38","guid":{"rendered":"https:\/\/tclynx.com\/construction\/?p=567"},"modified":"2024-09-13T14:08:18","modified_gmt":"2024-09-13T18:08:18","slug":"as-promised-video-from-august-16-2024","status":"publish","type":"post","link":"https:\/\/tclynx.com\/construction\/2024\/09\/13\/as-promised-video-from-august-16-2024\/","title":{"rendered":"As promised, Video, From August 16, 2024"},"content":{"rendered":"\n<p>Here is the drone footage I shot a day or so after the main slab was poured.<\/p>\n\n\n\n<figure class=\"wp-block-video\"><video height=\"1080\" style=\"aspect-ratio: 1920 \/ 1080;\" width=\"1920\" controls src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-videos.mp4\"><\/video><\/figure>\n\n\n\n<p>You will see an area of the back porch that is not done yet, They did come back and finish that the next week.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-1-1024x576.jpg\" alt=\"Great Room Area Concrete Slab\" class=\"wp-image-569\" srcset=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-1-1024x576.jpg 1024w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-1-300x169.jpg 300w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-1-768x432.jpg 768w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-1-1536x864.jpg 1536w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-1.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>It is still all dusty since no one has been on it since the crew cut the expansion joints.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-2-1024x576.jpg\" alt=\"Part of the Back Porch not finished yet\" class=\"wp-image-570\" srcset=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-2-1024x576.jpg 1024w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-2-300x169.jpg 300w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-2-768x432.jpg 768w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-2-1536x864.jpg 1536w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-2.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-3-1024x576.jpg\" alt=\"Looking at the Slab from South to North\" class=\"wp-image-571\" srcset=\"https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-3-1024x576.jpg 1024w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-3-300x169.jpg 300w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-3-768x432.jpg 768w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-3-1536x864.jpg 1536w, https:\/\/tclynx.com\/construction\/wp-content\/uploads\/2024\/09\/August-16-Slab-drone-Photo-3.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Here is the drone footage I shot a day or so after the main slab [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":571,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[7,10,9,52],"class_list":["post-567","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-progress","tag-construction","tag-florida","tag-lake-county","tag-slab"],"_links":{"self":[{"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/posts\/567","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/comments?post=567"}],"version-history":[{"count":1,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/posts\/567\/revisions"}],"predecessor-version":[{"id":572,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/posts\/567\/revisions\/572"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/media\/571"}],"wp:attachment":[{"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/media?parent=567"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/categories?post=567"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tclynx.com\/construction\/wp-json\/wp\/v2\/tags?post=567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}